Gabrovo
The area site, where the installation is situated is 5 000sq.m. The installation has an input sector, a sorting cabin and a storage accommodation for the baled recyclables. All the needed infrastructure was secured – power supply, sewerage and fencing.
The installation is built by modules which allows its quick dismantle and position on other site. German experience of module waste sorting installations was used into the design and the operation.



RSS